Rail

Installation of WiFi at various LU Stations. Detailed site survey and reports for installation of Data circuits (Copper and Fibre) Installation of New Power Circuits to include

  • Load Applications
  • Space Applications
  • SABRE/OAN
  • Redlines
  • PM

TAG and TRACE at Crossrail interlink sites.

Site Mangement at Birmingham New Street railway station

Digital Advertising Panels (CBS/LU)

  • Providing the Electrical expertise to successfully rollout the 1st ever Digital advertising panels on escalators at various prime location stations.

Digital Advertising (CBS Outdoor/LU)

  • Installation of Digital Advertising Panels
  • Manual Upload of Digital advertising panels with advertising data, this was prior to the Digital Advertising Panels being ‘networked’ and involved supplying a team of engineers to upload adverts from Spain via server onto PC and travel the network to download content directly to Digital Advertising Panel HD.
  • Design and Installation of Digital advertising Panels on the Central Line Escalator at Bank Station.
  • Provide Trouble shooting team to change out faulty Processor chips.

Blackfriars shutdown and relocation of tunnel supplies (Mouchel/LU)

  • Provide the electrical expertise to enable the relocating of all supplies from Blackfriars Station to adjacent stations Mansion House and Temple.
  • Design and Install Lighting and Tunnel Telephone system along the Blackfriars Tunnel Shield.
  • Shutting down and subsequent disconnection of Station to Station LUL feeder to Blackfriars Station.
  • Installation testing and commission of Blackfriars by-pass cable.

Under Platform Surveys (Mouchel /CTP/LU)

  • Carry out extensive Invert surveys and prepare detailed reports for CTP

MTVS Surveys (Mouchel/CTP/LU)

  • Carry out extensive surveys to Mid Tunnel Vent Shafts and prepare detailed reports for CTP

Intrusive Surveys (Mouchel/CTP/LU)

  • Carry out extensive intrusive surveys to Green Park Station for the installation of Station AHUs via Green Park pump room and prepare detailed reports for CTP

Installation of Customer Information Screens (Chiltern Rail)

  • Carry out extensive surveys to Mid Tunnel Vent Shafts and prepare detailed reports for CTP

MTVS Surveys (LIVIS/CTP/LUL)

  • Installation and electrical commission of CIS on the Chiltern Rail Network.

Various Installations for DLR/SERCO

  • Upgrade to Poplar depot incoming supply
  • Temporary install of power and lighting for major points work at Bank
  • Design and installation of new Computer Cab s in Bank SER
  • Various works at Beckton Dept
  • Installation of new Earthing system at Gallions Reach

Marble Arch Station (YJL/LU)

  • Provide labour for installation of Panelling at major refurbishment in Marble Arch

Full re-wire office block

  • Rewire of office building and penthouse flat in Derby Street , W1

Testing of No.1 Puddle Dock

  • Periodic testing of all mains sub feeders to No. 1 Puddle Dock a 6 storey office block situated over Blackfriars station owned by NWR.